Friday, October 15, 2010
Andrea Lucas: Project 1 Milling Update
The CNC did three passes with different sized drill bits for this project. It was all cut in approximately one hour. The high density foam held its form perfectly, though to get into the valleys, sharp V-cuts were not possible, so the design was distorted, very very slightly. All in all, it was pretty exciting to see it cut. (Thanks Bob)
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment